[2] CHU Huai-bao,LIANG Wei-min,YANG Xiao-lin,et al.Experimental study on tunnel wedge cut blasting[J].Modern Tunnelling Technology,2010,47(4): 27-30.(in Chinese)
[4] ZHANG Qi,YANG Yong-qi,YUN Yong-feng,et al.Study on the factors affecting parallel hole cut blasting[J].Rock and Soil Mechanics,2001(2): 144-147.(in Chinese)
[6] ZHANG Shou-tong.Application technology of fully computerized three-arm jumbo drill in tunneling mechanization construction[J].Modern Urban Transit,2022(1): 58-62.(in Chinese)
[8] LV Yun-song.Study on wedge cut and burn cut by three-arm jumbo drill in tunnel[J].Journal of Shandong Industrial Technology,2017(12): 137-139.(in Chinese)
[10] TIAN Hui-li,ZHANG De-qi,LI Zhan-jun.Application of cylinder cut for deep-hole blasting in stone drift[J].Coal Engineering,2005(4): 37-38.(in Chinese)
[12] ZOU Xin-kuan.Blasting dynamic response characteristics and vibration reduction technology in shallow-buried arch-tunnel[D].Southwest Jiaotong University,2016.(in Chinese)
[14] ZHOU Zhi-qiang,YI Jian-zheng,CAI Jun-feng,et al.Progress of study on blast hole stemming and its action[J].Explosive Materials,2009,38(5): 29-33.(in Chinese)
[16] ZHANG Yan-jun,LEI Mei-rong,NING Zhang-xuan.Study on wedge stemming plug of blast holes[J].Coal Engineering,2015,47(1): 60-62,65.(in Chinese)
[18] XUE Li,MENG Hai-li,KANG Yong-quan,et al.Development and characteristic analysis of single component polyurethane stemming material[J].J of Anhui University of Technology(Natural Science),2018,35(4): 313-318.(in Chinese)
[20] LI Sheng-lin,LIU Dian-shu,LI Ran,et al.The hole stemming and the reinforced stemming technique[C]∥New technology of blasting engineering in China(Ⅱ),2008: 893-898.(in Chinese)
[22] LIU Gao-chong.Study on mechanical properties and constitutive of polyurethane elastomer under static/dynamic conditions[D].Taiyuan: Taiyuan University of Technology,2017.(in Chinese)
[24] YAO Ke-yin.Small-diameter cannulation charge explosives and their application to rocks exploitation[J].Blasting,1991(1): 40-45.(in Chinese)