• BLASTING
  • Vol. 40, Issue 3, 108 (2023)
GUO Dong-ming*, LAN Fan-ge, ZHANG Wei, ZHU Ruo-fan..., YE Gui-chuan and ZHAO Zhi-feng|Show fewer author(s)
Author Affiliations
  • [in Chinese]
  • show less
    DOI: 10.3963/j.issn.1001-487x.2023.03.015 Cite this Article
    GUO Dong-ming, LAN Fan-ge, ZHANG Wei, ZHU Ruo-fan, YE Gui-chuan, ZHAO Zhi-feng. Study of Influence of Stemming Length on Blasting Effect[J]. BLASTING, 2023, 40(3): 108 Copy Citation Text show less
    References

    [1] QIAN Q H.Challenges faced by underground projects construction safety and countermeasures[J].Chinese Journal of Rock Mechanics and Engineering,2012,31(10): 1945-1956.(in Chinese)

    [3] LIU D,LU WB,CHEN M,et al.Attenuation formula of the dominant frequency of blasting vibration during tunnel excavation[J].Chinese Journal of Rock Mechanics and Engineering,2018,37(9): 2015-2026.(in Chinese)

    [5] WEI L Y,LI S C,XU B S.Stability analysis of Zhoushan subsea tunnel with drill-and-blast construction method[J].Rock and Soil Mechanics,2009,30(11): 3453-3459.(in Chinese)

    [7] ZHAO X T,CHENG G H,FENG J G.Calculation and experimental study of blast-hole stemming length[J].Chinese Quarterly of Mechanics,2010,31(2): 165-171.(in Chinese)

    [9] ZHANG YJ,HAN HQ,HUANG JX,et al.Study on influence of blast-hole stemming to blasting effect[J].Coal Technology,2014,33(5): 101-103.(in Chinese)

    [11] REN S F,YU H B,ZHAO M S,et al.Study of influence of stemming length on cutting blasting effect in tunnel excavation[J].Blasting,2017,34(2): 51-54,109.(in Chinese)

    [13] FENG Z B,YUAN S G,WANG Z.Study on influence of blasting cracking length on roadway blasting effect[J].Coal Technology,2018,37(5): 90-91.(in Chinese)

    [15] ZONG Q.Investigation into move regularity about stemmed material in hole charge blasting[J].Blasting,1996(1): 8-11.(in Chinese)

    [17] WANG C,WEN Z,CAO MY.Function of stemming and calculation of stemming length in tunnel blasting[J].Mining Technology,2011,11(5): 118-120.(in Chinese)

    [19] ZHANG YJ,CHEN YW,LEI MR,et al.Drilling blasting hole stemming length analysis[J].Blasting,2021,38(3): 45-49, 129.(in Chinese)

    [21] QIN S,WU DY,FAN LC.Reasonable calculating stemming length in the bore hole of blasting roadway[J].China Mine Engineering,2021,50(4): 1-4.(in Chinese)

    [23] HAO YF,LI HB,LIU KD,et al.Blasthole stemming length effects of single free-face blasting vibration characteristic[J].Rock and Soil Mechanics,2011,32(10): 3105-3110,3142.(in Chinese)

    [25] WANG W,LI XC.Experimental study of propagation law of explosive stress wave under condition of decouple charge[J].Rock and Soil Mechanics,2010,31(6): 1723-1728.(in Chinese)

    [27] LIANG WM,LIU HY,ZHOU FJ.Influence of air-decoupling charge on rock blasting[J].Transactions of Beijing Institute of Technology,2012,32(12): 1215-1218,1228.(in Chinese)

    [29] ZONG Q,MENG D J.Influence of different kinds of hole charging structure on explosion energy transmission[J].Chinese Journal of Rock Mechanics and Engineering,2003(4): 641-645.(in Chinese)

    [31] LIU BC.Study on Hole Stemming Theory of one-step deep hole raise blasting and its application[D].Changsha: Central South University,2014.(in Chinese)

    [33] ZHAO X T,HUANG H L.Study on vertical hole stemming length affecting rock blasting quality[J].Journal of Highway and Transportation Research and Development,2010,27(7): 94-99.(in Chinese)

    GUO Dong-ming, LAN Fan-ge, ZHANG Wei, ZHU Ruo-fan, YE Gui-chuan, ZHAO Zhi-feng. Study of Influence of Stemming Length on Blasting Effect[J]. BLASTING, 2023, 40(3): 108
    Download Citation