[2] PANG Wei-tai.Demolition of reinforced concrete chimney by directional blasting[J].Mechanics and Practice,1983(3):64-65.(in Chinese)
[4] LIU Yi,XIE Shou-dong,FU Jian-qiu.Vibration monitoring and safety analysis for the demolition of an 80m chimney by sectional blasting[J].Blasting,2020,37(3):103-108.(in Chinese)
[6] DONG Xing,ZHANG Zhe,LIU Yong-qiang,et al.Demolition practice and numerical simulation of 100 m reinforced concrete chimney by directional blasting[J].Blasting,2020,37(4):100-105, 115.(in Chinese)
[8] CHENG Nan.Directional blasting demolition of 210 m chimney in complex environment[J].Blasting,2021,38(1):100-104, 158.(in Chinese)
[10] REN Jiang,WANG Gao-long,WANG Xiao.Simultaneous blasting demolition of two 150 m reinforced concrete chimneys[J].Blasting,2020,37(4):94-99.(in Chinese)
[12] XU Shun-xiang,XIE Guang-bo,CHEN De-zhi,et al.Demolition of one 150m and two 210m high chimneys by directional blasting with+40m high cut[J/OL].Blasting:1-8.[202-09-14].http:∥kns.cnki.net/kcms/detail/42.1164.TJ.20220624.0832.002.html.(in Chinese)
[14] GAO Wen-le,DUAN Yao-kui,LIU Peng-hui,et al.Numerical simulation on blasting demolition of 120m high reinforced concrete exhaust tower[J].Blasting,2022,39(1):101-106, 129.(in Chinese)
[16] GAO Wen-le,LIU Zhi-cheng,LI Kun-peng,et al.Delay time of two-way cut demolition blasting of 100 m high reinforced concrete chimney[J].Blasting,2021,38(2):128-135.(in Chinese)
[18] YANG Hui,YUAN Yi-shuo,CHAI Ya-bo,et al.Directional demolition blasting of 180 m high reinforced concrete chimney in complex environment[J/OL].Engineering Blasting:1-13.[2022-04-04].DOI:10.19931/j.EB.20210166.(in Chinese)
[20] FANG Gui-fu,YU Xing-chun,Zhang Meng-chang,et al.Demolition of two cooling towers with a height of 105m by opposite blasting[C]∥ZHENG Bing-xu.China′s New Blasting Technology Ⅲ.Beijing:Metallurgical Industry Press,2012.(in Chinese)
[22] ZHANG Jian-ping,WANG Jun-sheng,HU Jun-tao.Blasting demolition of 150 m reinforced concrete chimney[J].Engineering Blasting,2016,22(1):82-85.(in Chinese)
[24] YUAN Shao-guo,WANG Zong-guo.Analysis of directional dumping blasting for damaged inclined chimney and its effect[J].Blasting,2004,21(4):48-49,67.(in Chinese)
[26] HU bin,YANG Sai-qun,LI Hong-wei,et al.Calculation and numerical simulation of blasting notch angle of Ultra-high Steel Concrete Chimney[J].Engineering blasting,2022,28(1):99-106.Doi:10.19931/j.eb.20210299.(in Chinese)
[28] GB 6722—2014 Safety regulations for blasting[S]. Beijing:Standards Press of China,2015.(in Chinese)
[30] ZHENG Bing-xu,WEI Xiao-lin,CHEN Qing-shou.Mechanical analysis of cutting support destabilization of high rein forced concrete chimney[J].Chinese Journalof Rock Mechanics and Engineering,2007,26(S1):3348-3354.(in Chinese)